Sign In | Join Free | My chinalane.org
China Shenzhou Earth Working Material Co. Ltd logo
Shenzhou Earth Working Material Co. Ltd
Infrastructure Facilitator Resilient Solution
Verified Supplier

1 Years

Home > Polypropylene Nonwoven Geotextile >

100% polypropylene non woven geotextile , PP Staple Fiber geotextile fabric OEM

Shenzhou Earth Working Material Co. Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

100% polypropylene non woven geotextile , PP Staple Fiber geotextile fabric OEM

  • 1
  • 2

Brand Name : SZ

Model Number : 150-800gram/sqm

Certification : ISO / CE

Place of Origin : China

MOQ : 20GP

Price : $0.3-$2.0/SQM

Payment Terms : L/C,T/T,Western Union,MoneyGram

Supply Ability : 6-8 Ton Per Day

Delivery Time : 5-8 days

Packaging Details : By Roll With Woven Bag

Product Name : PP Polypropylene Nonwoven Geotextile

Application : Road construction, drainage, erosion control, etc.

Function : Filtration

Type : Nonwoven

Elongation : 50-90%

Color : White/Black

Roll Length : 50-100m

Weight : 100-800gsm

Contact Now

100% Polypropylene PP Staple Fiber Needle Punched Non Woven Geotextile

Description:

100% polypropylene Staple Fiber Needle punched non woven Geotextile. It has been characterized by high strength, maximum width (6 m) and UV resistant itself with inhibitor. It is resistant to commonly encountered soil chemicals, mildew and insects, and is non biodegradable.

Product name
100% polypropylene Staple Fiber Needle punched non woven Geotextile
Raw materials
PP (polypropylene)
Length
50--100m(or as your demand)
Weight
100--800gsm
Roll Size
1-8m
Payment terms
TT/LC
Product Features
● Can withstand construction installation stresses
● UV (Ultra Violet) Stabilized
● High Chemical Resistance
● Optimum Elongation
Product Application
1. Separation
The isolation of the railway dregs and the roadbed, roadbed and the soft base, surface of the airdrome and parking lot and the groundsill, different dam materials. It isolates the soil and the gravel of two kinds different granule pathway from the groundsill or other buildings.
2. Reinforcement
The highway, railway, soil-stone dam, breakwater, airport, backfill soil of retaining wall, slope protection, etc in which distributes the earth stress, prevents the side-displacement of the earth body and improves the earthbody stability.
3. Protection
It prevents the bank from being washed out, protects the bank and the bottom, prevents the water and soil from being washed away.
Remarks
Nonwoven Geotextiles are available in varying strengths and thicknesses to ensure appropriate material selection for your project.
Custom roll sizes are also available.

100% polypropylene non woven geotextile , PP Staple Fiber geotextile fabric OEM100% polypropylene non woven geotextile , PP Staple Fiber geotextile fabric OEM

100% polypropylene non woven geotextile , PP Staple Fiber geotextile fabric OEM100% polypropylene non woven geotextile , PP Staple Fiber geotextile fabric OEM

Production process :

The production process of polypropylene non-woven geotextile mainly includes the following steps:

‌Opening‌:

loosen the polypropylene short fiber raw material to make it a loose fiber state.

‌Combing‌:

comb the opened fibers to make the fibers more neat and straight, and remove impurities and short fibers.

‌Web laying‌:

evenly lay the combed fibers into a fiber net of a certain thickness and width.

‌Needling‌:

repeatedly needle-punch the fiber net with a barb needle to make the fibers entangled and embraced

with each other to form a non-woven geotextile with certain strength and stability.

‌Consolidation and shaping‌:

hot pressing or chemical treatment of the geotextile after needle punching to further improve the

dimensional stability and mechanical properties of the geotextile‌

100% polypropylene non woven geotextile , PP Staple Fiber geotextile fabric OEM

Road construction
200gsm,300gsm
Landfill
300gsm
Dam construction
300gsm
Landscape for slope area
low gsm
Greenhouse insulation
400 gsm
Asphalt pavement maintenance
200 gsm
Railway roadbed
700 gsm

GEOTEXTILE INST ALLATION

To pave by roll with artifical method, the fabric must be level and appropriately leave the margins for

deformation. The inst lation method usually has overlapping, sewing and welding.

The overlapping part is generally more than 0.2m.

It should be welded or stitched for the exposed geotextiles.

AII sewing must be continuously carried out(for example, point-sewing is not allowed),

the geotextiles must be overlapped more than 200mm before overlapping.

The minimum distance between sewing needle and the fabric edge(the edge of exposed material) is at least 25mm.

Welcome To Contact With us !


Product Tags:

Polypropylene Non Woven Geotextile OEM

      

PP Staple Fiber Geotextile Fabric

      
Wholesale 100% polypropylene non woven geotextile , PP Staple Fiber geotextile fabric OEM from china suppliers

100% polypropylene non woven geotextile , PP Staple Fiber geotextile fabric OEM Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shenzhou Earth Working Material Co. Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)